Thursday, August 25, 2011

New Floor Part 2


Thursday (Day 6th)
The back door should be done today. But I had not talked to TJ so I was not sure if he was coming over or not. To my surprise when I pulled up his truck and trailer were there. When I walked in he was hard at work finishing up the back door. I got out of his way and did some work on the computer.



About a half hour later he came looking for me and we talked about some of the things he had done. He replaced the boards under the floor. He said he was not charging me for that but that he felt better about having the old ones out of there. He fixed the whole in the floor with a patch and He finished putting down the floor.







He was in a hurry since he had to pick his kids up at 4 and it was 5 so I told him I would clean up. He has to come back tomorrow or Saturday to put new locks on the door and to finish one or two things and pick up a couple of things he left by accident. When he left I noticed that he had the trim back on. Not only the two places where I thought I needed them, since the old stuff broke. He replaced all of it. That was a surprise since I thought it would be a while before I could save the money for that. I am very happy with the way it turned out and if I need anything done I will call him first.

No comments: