So since I bought enough flooring to do my other bathroom and TJ is giving me a great deal we went ahead and did my other bathroom. The guy that helps him is from out of town and didn't want him to have to come back and TJ was willing to help me out if money became a issue but since we never used the plumber in the estimate and i told him I had the total of the estimate and he thought we would not come close to it i should got had. since there was not big repairs this job was easier then the other bathroom. He finished the other bathroom as well and so i am all set to go.
He finished on Friday. If you noticed from the picture that shows the hallway can you see what is missing. I got home late Thursday from work and he had called to see if there was anything left. He had to leave to meet a guy and had left his helper here to finish the trim. But then he could not get a hold of the guy. My first thought thought (and Greg laughed at me and said the jog would be free and I could buy another one with what it would have coast me) was my TV better still be there. It was. I called TJ and everything looked good and that the shut off value was leaking so to look at that when he came by to pick up his trailer. After a half or so I realized the door to the bathroom was not there. He had called me in the morning but I was already at work so I called him back and I told him about the door and he laughed because I guess he forgot about it too. and said he would make sure he would get it back on. When I got home everything was good to go. So now I will just see what the bill will be. He said it should not go over the estimate even with the other bathroom added on so that should be good. I will be calling him again if i need work done again. I know the roof needs to be done soon so I think thais email and phone number handy. t will be a job for TJ if he wants it. I will keep his number and email handy.
Marsha's Slow Cooker Sweet Pork For Burritos
5 years ago
No comments:
Post a Comment